Assembly of the TECEdrainpoint S
The instruction shows the assembly with Seal System sealing sleeve in a composite sealing.

Step 1: Before the drain is inserted and connected, the base is expertly prepared via sound insulation measures.

Step 2: The area is now filled with screed.

Step 3: The protective foil is removed from the drain to add the first layer of the composite seal.

Step 4: The Seal System sealing sleeve is inserted into the first coat of the composite seal while it is still wet and then another coat is added to this.

Step 5: Once the composite seal has been completely applied, the drain top is adjusted to the height of the floor cover.

Step 6: After tiling and grouting, the cover is inserted. This concludes the assembly.